the eternal pipe upgrade
the journal of Michael Werneburg
twenty-seven years and one million words
I'm getting pretty tired of this pipe upgrade in my building. The fellow who failed to fix the shower controls after he buggered them up was back for more today. Rather than actually fix the controls, though, he left his assistant to half-way fix the holes in the ceiling of the closet and the shower. Another two days without shower facilities. That brings the total to 14 in four weeks. Sheesh!
Another minor site redesign. While I still have the new home page under wraps, I've tweaked the appearance of the remainder of the site to what you see here. Desided the previous one looked a touch sloppy (even if it was attracting some positive feedback). Insanely, it also seems that the various pages on etherlabs.net are driving an average of around 1200 page requests a day. That's even more than some of the other sites that are hosted here.